Wastewater Treatment Plant: External hydrant systems.
| Atotonilco, Hidalgo.
Alarm and detection system | Apodaca, Nuevo León
Biofields Castor Oil Extraction Plant: Fire protection system.
FM200 system, deluge
system, pre action and sprinklers.
Bayer Orizaba (Veracruz).Fire systems
Ccl: CO2 suppression system and smoke detectors.
(Now Voridian) Alarm system and detection | Cosoleacaque, veracruz
Pemex Gas Cryogenic Plant and Basic Petrochemical: Deluge
systems for container tanks in the process area and FM200 system,
control room. CD. Pemex, Tabasco.
PEMEX Plant substations: Gas and basic petrochemical.
Monitor hydrant system, battery separator. Poza Rica Veracruz.
Automatic sprinkler systems.
Fire detection and protection system in compression, regulation
and measurement stations.
Ethylene XXI Project – ICA Flour: Automatic sprinkler systems,
internal and external hydrant network.