ABOUT US

MANAGEMENT PHILOSOPHY

Mission

Offer engineering and project execution services that ensure the operation of our clients´ facilities in accordance with current specifications and applicable regulations for companies that require high performance standards in their facilities.

Vision

Establish ourselves as the preferred company for the execution of installations and engineering projects, achieving recognition of excellence and added value in our engineering services in the national market.

Values

Our main values are honesty, integrity, security, quality, respect towards the environment and others, and social responsibility.

HISTORY

ELEMSA WAS FOUNDED

ELEMSA was founded in 1957 as a response to the electrical equipment demands of the Mexican market.

  • At first

    The company focused on manufacturing of transformers, electric rods and lighting fixtures.

  • Later on

    We ventured into the smoke detection area in the mid-sixties.

  • As time went by

    We increased our reach and capabilities in other fire detection and extinction areas. Currently, we cover all the available systems on the market for this purpose.

  • Throughout our history

    We have set up installations to protect emblematic sites in the country such as The National Museum of Anthropology and History (Museo Nacional de Antropologia e Historia), The National Archive El Archivo de la Nacion), The National University Museum of Contemporary Art (Museo Universitario de Arte Contemporaneo); The NAFINSA and BANAMEX art Collections.

  • For the past twenty years

    We have expanded our scope of design and execution to installations of all types.

OUR PROJECT LOCATIONS