We are one of the most important companies in Mexico in the field of installations, both in terms of design and assembly, with aparticular focus on fire detection and protection systems, electrical systems (high, medium and low voltage) and hydraulic systems.
From hospitals and industrial warehouses to the most complex chemical and petrochemical plants, our team offers the best alternatives for solving installation problems, meeting the highest international standards.
Installations Elemsa covers the entire national territory, offering comprehensive solutions for installations, from engineering design to commissioning and maintenance.
Samalayuca Thermoelectric plant: Alarm and detection system.
Suppression system based on Inergen R Gas in control room.
Ciudad Juarez Chihuahua.
Electrical, Hydraulic and Sanitary Installation, Fire protection and detection, HVAC and special systems.
Fire detection and protection system in compression, regulation and measurement stations. | San Luis Potosí, Querétaro y Guanajuato.
FM200 system, deluge
system, pre action and sprinklers.
Gas and fire detection system and suppression with CO2 agent. (In progress).
Ethylene XXI Project – ICA Flour: Automatic sprinkler systems,
internal and external hydrant network.









